Confirm Eco or Plus based on the sensor and job requirements.
PublicCreate the Monitoring Profile and prepare the Main Tank.
PortalAdd reserve tanks or tank objects only if the site needs them.
OptionalMount the unit and sensor, route and protect the required cables and connectors, and install power.
FieldUse the Link Code to connect the physical unit to the portal record.
ConnectConfirm readings, status, Wi-Fi/cellular connection, and sharing.
FinishUse this when you want to start tracking immediately without installing hardware yet.
Start with Main TankUse this for standard top-mounted ultrasonic monitoring with a Main Tank and optional reserve.
Open Portal GuideUse this for Pebble Eco 2 or Plus, RS485 or submersible sensors, analog modules, tank-top switches, or M12 Sensor Bus v1 installation.
Open M12 Sensor Bus GuideLink the physical Pebble only after the installer has confirmed which Monitoring Profile, tank relationship, and sensor configuration the physical hardware is intended to serve.
Use this as the handoff checklist after hardware and portal setup are complete.